Southwest Corridor 경전철 사업의 설계 작업은 2020년 유권자들이 여러 교통 개선을 위한 지역 재정 지원 조치를 거부함에 따라 일시 중단되었습니다. 2022년 초 Metro, TriMet 및 미국 연방 대중교통국(Federal Transit Administration)은 이 프로젝트에 향후 연방 재정 지원을 받기 위한 최종 환경 영향 보고서(FEIS) 작성을 완료하고 결정 기록(ROD)을 발행했습니다. 관련 문서를 보려면 Metro 프로젝트 웹 사이트를 참조하십시오.

Overall Project Improvements:
Bike and Walk Improvements

The project will add over six miles to the region’s system of bike facilities. Raised protected bike lanes are included between Barbur Transit Center and Naito Parkway. These lanes separate bicyclists from automobiles by a curb-protected furnishing zone. Other parts of Barbur Boulevard will consist of buffered bike lanes, which are striped cyclist-only lanes that create separation between cyclists and automobiles at street level.

Along Barbur, the project includes safer intersections that protect pedestrians and bicyclists from traffic. A full protected intersection (Type 1) provides separation and protection for bicyclists and pedestrians moving in every direction. Other types (Type 2 and Type 3) will be applied along the corridor as appropriate to address narrower roadways.

 

Pedestrian Improvements

A major benefit of the Southwest Corridor Light Rail project is the increased pedestrian permeability across Barbur Boulevard, making the crossings locations throughout the corridor as safe and comfortable as possible, while maintaining light rail operations and vehicular traffic. With guidance from PedPDX, Portland’s citywide pedestrian plan, the project increases the overall permeability of Barbur Boulevard through additional marked crossings. The design of crossing frequencies strives to meet a 530’ desired spacing within designated pedestrian districts and an 800’ desired spacing outside of pedestrian districts. More details on pedestrian crossings can be viewed in each of the station pages.

 

 

example

Pedestrian crossings

Bike Facilities

The project includes significant improvements to the bike facilities along Barbur Boulevard, allowing cyclists of all ages and abilities to safely and comfortably access destinations along the corridor. For four miles from Barbur Transit Center to Naito Parkway, this bikeway will consist of raised protected bike lanes. These lanes separate people on bikes from automobiles by a curb-protected furnishing zone. North of Naito Parkway, the street will include buffered bike lanes, which are striped cyclist-only lanes that create separation between cyclists and automobiles at street level.

The project also adds safer intersections that protect pedestrians and bicyclists from traffic through the intersection. A full protected intersection (Type 1) provides separation and protection for bicyclists and pedestrians moving in every direction. This design also requires space that will not be available at every intersection. Other types (Type 2 and Type 3) will be applied along the corridor as appropriate to address narrower roadways.

 

Barbur improvements map

bike facilities

 

raised protected bike lane

Raised Protected Bike Lanes cross section

 

Protected Intersection Type 1

raised protected bike lane

Protected Intersection Type 2

raised protected bike lane

Protected Intersection Type 3

raised protected bike lane

 

 

의견 또는 궁금한 점이 있으십니까?

자세한 내용은 503-962-2150으로 전화하거나 이메일 을 보내십시오.

 

 

이메일을 등록하고 최신 정보를 받으십시오


프로젝트 파트너

TriMet북 지하 오레곤 교통국(ODOT) Washington Couty실 City of Durham City of Portland City of Tigard City of Tualatin