Southwest Corridor 경전철 사업의 설계 작업은 2020년 유권자들이 여러 교통 개선을 위한 지역 재정 지원 조치를 거부함에 따라 일시 중단되었습니다. 2022년 초 Metro, TriMet 및 미국 연방 대중교통국(Federal Transit Administration)은 이 프로젝트에 향후 연방 재정 지원을 받기 위한 최종 환경 영향 보고서(FEIS) 작성을 완료하고 결정 기록(ROD)을 발행했습니다. 관련 문서를 보려면 Metro 프로젝트 웹 사이트를 참조하십시오.

설계, 역 및 노선 안내

Portland > Tigard > Tualatin

The Southwest Corridor Light Rail Project would connect Downtown Portland and Tualatin with a 30-minute travel time and bring high-capacity transit to one of the region’s most congested corridors. Based on the Conceptual Design Report, published in September 2020, it would include 13 stations along the 11-mile alignment as well roadway, bicycle and pedestrian improvements throughout the corridor.

The route would travel south from the Portland Transit Mall near Portland State University via Barbur Boulevard until the Barbur Transit Center. From there, it would cross Interstate 5 on a new bridge and then run adjacent to I-5 to Tigard. The route would serve the Tigard Triangle with two stations, cross Highway 217, serve Downtown Tigard and then travel to a station and Park & Ride at the end of the line at Bridgeport Village in Tualatin.

The design and alignment concepts shown here are based on the Conceptual Design Report, published in September 2020. If the project were to restart at a future date, these designs could change.

Major destinations include:

  • Portland State University
  • Marquam Hill and the many health centers located there
  • The Barbur Transit Center
  • West Portland Town Center
  • Portland Community College Sylvania Campus
  • Tigard Triangle
  • Downtown Tigard
  • Bridgeport Village

 

Conceptual Design Report

The Conceptual Design Report, published in September 2020, presents the goals and preliminary designs of the Southwest Corridor Light Rail Project based on community and project partner input over several years. It describes and illustrates the overall urban design vision as well as the conceptual designs for stations, major structures and other key corridor improvements. The document could be used to further public discussion about the project design if the project is restarted.

Fly-through

Project principles

The Southwest Corridor Light Rail Project aims to help the region realize its shared values. To help ensure this, project partners developed a set of principles, based on adopted local plans and years of community engagement in the Corridor. Each principle is supported by goals and objectives that will be used to measure success and ensure that investments provide the best value to local communities and our region.

 

Mobility and Connectivity

Move and connect people

Community

Maintain and create equitable communities

환경

Preserve and restore natural environment

Future

Design for the future

Stations and Project improvements

Below is a list of stations and other key improvements of the Southwest Corridor Light Rail Project. For more detailed information about the project, see the full Conceptual Design Report.

 

 

 

 

Inner Portland: Downtown Portland to Marquam Hill

 

 

 

Outer Portland: SW 13th Avenue to SW 53rd Avenue

 

 

 

 

 

Station Access Projects

The Shared Investment Strategy adopted in 2013 by the project steering committee, recommended a narrow list of strategic roadway, bike and pedestrian projects to potentially construct. These station access projects are not in the current project budget, but could be designed and built by the project, if other funding sources are secured.

 

 