Southwest Corridor 경전철 사업의 설계 작업은 2020년 유권자들이 여러 교통 개선을 위한 지역 재정 지원 조치를 거부함에 따라 일시 중단되었습니다. 2022년 초 Metro, TriMet 및 미국 연방 대중교통국(Federal Transit Administration)은 이 프로젝트에 향후 연방 재정 지원을 받기 위한 최종 환경 영향 보고서(FEIS) 작성을 완료하고 결정 기록(ROD)을 발행했습니다. 관련 문서를 보려면 Metro 프로젝트 웹 사이트를 참조하십시오.

Inner Portland:
Gibbs Street Station

Nestled between the historic Lair Hill neighborhood and the forested West Hills of Terwilliger Parkway, the Gibbs Street Station will provide a critical connection for the thousands of employees, patients and students visiting Marquam Hill every day. Enhanced pedestrian crossings will make it easier for South Portland residents to access Terwilliger Parkway’s natural beauty and expansive views. With a new crossing of SW Naito Pkwy and the Marquam Hill Connector, a pedestrian connection will reach from the South Waterfront to Marquam Hill. These connections will provide direct access to the light rail station, and a new public plaza.

 

Former synagogue building site constraints PDF

Downtown Portland to Marquam Hill map

Downtown Portland to Hamilton Street

 

Conceptual rendering
Subject to change

Gibbs Station cross section

Station overview

Gibbs station overview

Station features

Gibbs Station features

Station cross section

Gibbs Station cross section

공익

Mobility and Connectivity

Mobility & Connectivity

  • Three new and improved pedestrian crossing along SW Barbur Blvd
  • Enhanced pedestrian crossings of SW Barbur Blvd and SW Naito Pkwy at SW Gibbs St intersections, connecting neighborhoods Marquam Hill and South Waterfront
  • Re-designed Barbur-Naito intersection for safer bike and pedestrian mobility
  • Planned connections to bus lines 44, 56 (shared transitway) line 43 on 1st Ave, and lines 54, 96 on SW Naito Pkwy
  • One travel lane retained in each direction along SW Barbur Blvd, north of SW Naito Pkwy
Community

Community

  • Access to Lair Hill, Homestead and South Waterfront neighborhoods, and Marquam Hill destinations
  • Narrowed street section maintains emergency access while minimizing park and historic property impacts
  • Access to Terwilliger Parkway, Duniway and Lair Hill Parks
환경

환경

  • Enhanced street tree canopies and stormwater treatment along SW Barbur Blvd

 

 